{"product_id":"lifetime-impact-44-polyethylene-basketball-backboard-and-rim-combo-model-90703-outdoor-play-1-per-pack","title":"Lifetime Impact 44\" Polyethylene Basketball Backboard and Rim Combo, (Model 90703)-Outdoor Play, 1 per pack","description":"\u003cdiv\u003eLifetime Impact 44\" Polyethylene Basketball Backboard and Rim Combo, (Model 90703)-Outdoor Play, 1 per pack - This backboard combo from Lifetime Products features a 44-Inch Impact Backboard and a black Classic Rim. The Impact backboard is molded of high-density polyethylene and has UV-protected, fade-resistant graphics. The 18 in. rim is made of 5\/8 in. solid steel with 1\/2 in. steel braces and includes a heavy-duty nylon net. The universal mounting bracket is available for purchase and provides a solid attachment when mounting the backboard directly to a roof, eave or wall. So enjoy the versatility of a backboard combo from Lifetime Products and play the game the way you want.\u003c\/div\u003e\u003cdiv\u003e\u003cul\u003e  \u003cli\u003e\u003cstrong\u003eLifetime Impact 44\" Polyethylene Basketball Backboard and Rim Combo, (Model 90703)-Outdoor Play\u003c\/strong\u003e\u003c\/li\u003e  \u003cli\u003e\u003cstrong\u003eBackboard:\u003c\/strong\u003e\u003c\/li\u003e  \u003cli\u003e\u003cstrong\u003eRim:\u003c\/strong\u003e\u003c\/li\u003e  \u003cli\u003eBackboard Size: 44 in.\u003c\/li\u003e  \u003cli\u003eBackboard Dimensions: 43.38\" x 28\" x 1.25\"\u003c\/li\u003e  \u003cli\u003eBackboard Surface: High-Density Polyethylene\u003c\/li\u003e  \u003cli\u003eBackboard Type: Impact\u003c\/li\u003e  \u003cli\u003eRim: Classic\u003c\/li\u003e  \u003cli\u003eAll-Weather Net Weight: 70g\u003c\/li\u003e  \u003cli\u003eMounting Hardware Sold Separately. \u003c\/li\u003e \u003c\/ul\u003e\u003c\/div\u003e\u003cdiv\u003e\n\u003cb\u003eSpecifications\u003c\/b\u003e\u003cbr\u003e\u003cbr\u003e\u003cb\u003eBasketball backboard size\u003c\/b\u003e: 44\"\u003cbr\u003e\u003cb\u003eBasketball rim type\u003c\/b\u003e: Breakaway Basketball Rim\u003cbr\u003e\u003cb\u003eMaterial\u003c\/b\u003e: High-density polyethylene\u003cbr\u003e\u003cb\u003eFeatures\u003c\/b\u003e: All-Weather, Weatherproof\u003cbr\u003e\u003cb\u003eMount type\u003c\/b\u003e: Wall Mount\u003cbr\u003e\u003cb\u003eRec location\u003c\/b\u003e: Indoor and Outdoor\u003cbr\u003e\u003cb\u003eDiameter\u003c\/b\u003e: 18 in\u003cbr\u003e\u003cb\u003eBasketball backboard type\u003c\/b\u003e: Basketball Backboard and Rim Combo\u003cbr\u003e\u003cb\u003eBrand\u003c\/b\u003e: Lifetime\u003cbr\u003e\u003cb\u003eWeight\u003c\/b\u003e: 20 lb\u003cbr\u003e\u003cb\u003eAssembled product height\u003c\/b\u003e: 29.7 in\u003cbr\u003e\u003cb\u003eAccessories\u003c\/b\u003e: Hardware\u003cbr\u003e\u003cb\u003eAge group\u003c\/b\u003e: Adult\u003cbr\u003e\n\u003c\/div\u003e","brand":"UNITY RCM shop","offers":[{"title":"Default Title","offer_id":48730655457507,"sku":"885289939_parent","price":89.1,"currency_code":"THB","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0787\/0251\/0307\/files\/Lifetime-New-Basketball-Indoor-Outdoor-Backboard-and-Rim-Combo-44-inch-Impact-90703-Mounting-hardware-not-included_def6505d-6cba-4b0a-83a1-2172a0ad62ea.dbe40ec3d7b74010f0508aa3b4a11ea.jpg?v=1775447697","url":"https:\/\/unityrcm.shop\/products\/lifetime-impact-44-polyethylene-basketball-backboard-and-rim-combo-model-90703-outdoor-play-1-per-pack","provider":"UNITY RCM shop","version":"1.0","type":"link"}