Lifetime Impact 44" Polyethylene Basketball Backboard and Rim Combo, (Model 90703)-Outdoor Play, 1 per pack

Lifetime Impact 44" Polyethylene Basketball Backboard and Rim Combo, (Model 90703)-Outdoor Play, 1 per pack

89.10 ฿
Sale price  89.10 ฿ Regular price 
Skip to product information
Lifetime Impact 44" Polyethylene Basketball Backboard and Rim Combo, (Model 90703)-Outdoor Play, 1 per pack

Lifetime Impact 44" Polyethylene Basketball Backboard and Rim Combo, (Model 90703)-Outdoor Play, 1 per pack

89.10 ฿
Sale price  89.10 ฿ Regular price 
Lifetime Impact 44" Polyethylene Basketball Backboard and Rim Combo, (Model 90703)-Outdoor Play, 1 per pack - This backboard combo from Lifetime Products features a 44-Inch Impact Backboard and a black Classic Rim. The Impact backboard is molded of high-density polyethylene and has UV-protected, fade-resistant graphics. The 18 in. rim is made of 5/8 in. solid steel with 1/2 in. steel braces and includes a heavy-duty nylon net. The universal mounting bracket is available for purchase and provides a solid attachment when mounting the backboard directly to a roof, eave or wall. So enjoy the versatility of a backboard combo from Lifetime Products and play the game the way you want.
  • Lifetime Impact 44" Polyethylene Basketball Backboard and Rim Combo, (Model 90703)-Outdoor Play
  • Backboard:
  • Rim:
  • Backboard Size: 44 in.
  • Backboard Dimensions: 43.38" x 28" x 1.25"
  • Backboard Surface: High-Density Polyethylene
  • Backboard Type: Impact
  • Rim: Classic
  • All-Weather Net Weight: 70g
  • Mounting Hardware Sold Separately. 
Specifications

Basketball backboard size: 44"
Basketball rim type: Breakaway Basketball Rim
Material: High-density polyethylene
Features: All-Weather, Weatherproof
Mount type: Wall Mount
Rec location: Indoor and Outdoor
Diameter: 18 in
Basketball backboard type: Basketball Backboard and Rim Combo
Brand: Lifetime
Weight: 20 lb
Assembled product height: 29.7 in
Accessories: Hardware
Age group: Adult

You may also like